Rage 3
<br />Steven S,arklozy,
<br />August 17, 1991
<br />With these ideas in, m, ind
<br />one, of the following two alternatives
<br />is recommended for the 19,911 PMP
<br />~
<br />Neighborhood 19: Heignel Drive, He�ineill Circle, South Owasso
<br />Neighborhood 56: Streets bound by Highway 36, Hamiline
<br />Avenue, County Road.B. and Lexington
<br />Avenue
<br />III -M 10
<br />Neighborhood 57.ei Stirelletisi bound by County Road B, Hamiline
<br />Avenue, Rosielawn Avenue, and Lexington
<br />Avenue
<br />Neigrmorhood 68: Stireets, bound by the St. Paul Water Works,
<br />Roselawn Cemetery, Larpenteur Avenue,, and
<br />Dale,, Street
<br />41 1
<br />This alternate, addriesses the petitions, received from Neighborhoods
<br />191, 56,1 and 51T. Total construction cost is.estimated to be
<br />$2,218,4101 of which, approximately $5001,010101 has already been
<br />designed. 'Work Previously completed iincludes Neighborhoo'd 19 and
<br />a portion of' Neighborhood 57*
<br />ALTERNATE 2
<br />Nei, 1410hborhood, 45.e Fairways Lane and, Fu,l,h,am Street south of
<br />County Road Bi
<br />GI
<br />vi
<br />Neighborhood, 44. Eustis Street St. Croix Street, St.
<br />(west half') Stielphein Street, north of County Road B and
<br />south of Highway 36
<br />Neighborhoods 56,1 571, and 68 ('Slame as in Alternate 1)
<br />This alternate addresses the peti, tions received for Neighborhoods
<br />45 516, and 57. T�o,tal construction cost is estimated to be
<br />$2,4180.055 of which, approximately $801,01010 has already been
<br />,designed, Work Previously completed *includes a portion of
<br />
|