Laserfiche WebLink
Rage 3 <br />Steven S,arklozy, <br />August 17, 1991 <br />With these ideas in, m, ind <br />one, of the following two alternatives <br />is recommended for the 19,911 PMP <br />~ <br />Neighborhood 19: Heignel Drive, He�ineill Circle, South Owasso <br />Neighborhood 56: Streets bound by Highway 36, Hamiline <br />Avenue, County Road.B. and Lexington <br />Avenue <br />III -M 10 <br />Neighborhood 57.ei Stirelletisi bound by County Road B, Hamiline <br />Avenue, Rosielawn Avenue, and Lexington <br />Avenue <br />Neigrmorhood 68: Stireets, bound by the St. Paul Water Works, <br />Roselawn Cemetery, Larpenteur Avenue,, and <br />Dale,, Street <br />41 1 <br />This alternate, addriesses the petitions, received from Neighborhoods <br />191, 56,1 and 51T. Total construction cost is.estimated to be <br />$2,218,4101 of which, approximately $5001,010101 has already been <br />designed. 'Work Previously completed iincludes Neighborhoo'd 19 and <br />a portion of' Neighborhood 57* <br />ALTERNATE 2 <br />Nei, 1410hborhood, 45.e Fairways Lane and, Fu,l,h,am Street south of <br />County Road Bi <br />GI <br />vi <br />Neighborhood, 44. Eustis Street St. Croix Street, St. <br />(west half') Stielphein Street, north of County Road B and <br />south of Highway 36 <br />Neighborhoods 56,1 571, and 68 ('Slame as in Alternate 1) <br />This alternate addresses the peti, tions received for Neighborhoods <br />45 516, and 57. T�o,tal construction cost is estimated to be <br />$2,4180.055 of which, approximately $801,01010 has already been <br />,designed, Work Previously completed *includes a portion of <br />