Laserfiche WebLink
City Council 2 July 13, 19910 1 <br />A. Inspections: <br />1,. Clommericial/Industrial b ilannual i nspections, on a cost- <br />covering fee basis,, to ensure compilance. wirn the City <br />Codes (including fire codies) and, special conditions <br />established by the City, <br />2.1 Multifamily ('over three units) biannual inspections, • a <br />cost-coverling fee basis,-to, ensure compliance with city <br /># 41 <br />Codes, (Including Fire Codes) and special conditions <br />elstab 11 i shed by the C ity. <br />Single family �('th,rieie units and less) residential inspec- <br />tilons,, on, a coist-covering fee basils and scheduled <br />0 <br />periodicially-to, ensure compliance with a Housing Code. <br />4,m. Design, Rievilew Boa,rid to address 'issues of style, quality, <br />landscaping,, eitic. <br />B., Planning: <br />1,, Preparation of Code Inspection programs (previous, A. 1-4)a <br />a) Park planning <br />• Transportation planning <br />c) Pathway planning <br />I <br />d) Housing evaluations <br />01 <br />e) Preparation, of Requests for Proposals <br />d <br />cei Economic Development: <br />More emphasis, would be placed, on, pro active approach, designed <br />to accomplish previously prepared, deVelopment and redevelopment <br />plans (le.igi. Twin Lakes) and made possliD.Le by the t mime freed <br />up from other duties and pro"planning of objectives. <br />!M'PLE <br />'The full, limp 1 em,en,tat i on of' the long-term, objective's is to be <br />I* ft <br />consia,ered on a stepmmmmby�step basis with Council approval of each <br />phase 11, <br />I M <br />The first step in the implementation of the objectives-is the <br />approval to hire one full-time Pilanner.1 Funds for the position <br />are included in the proposed, 1991 budget,. I <br />