Laserfiche WebLink
REQUEST FOR ,COI UN'CIL ACTION DATE: 9/24/90 <br />ITEM NO. <br />Department ]�Vp <br />q7ioyal Manager Reviewed: Agenda Section. <br />Reports and <br />Item Description: Consideration of award of bid, City Project M-90-19 <br />publi'Lc works unheated, stiorage' facility I <br />In accordance with past council action and the approved 1990 operating <br />budget, plans were completed and bids have been received for the public <br />Is a 9 <br />works, unheated, storage facility, Attached for council review is a <br />summary of the bid tabulation sheet. Wei received bids from seven <br />a <br />contractors,,, all olf whiomappear to be qualified building construction <br />general contractiors, 16 <br />The base bid io s to ble used, as the bas. 'is for making award of the bid <br />lills <br />a <br />Thei base blid includes the following thriele izems. <br />Complete public works cold storiage building construction <br />including all building improvements and exterior landscaping <br />2*1 New fueling station including reloicated tanks, pumps, and fuel <br />Is <br />dispensing r equipment <br />3 Re-rolof ingi for tihe ex isting city hall bu i'llding and approximately <br />% of the existing north wing of the public works garage. <br />The remainder of the bid consists of several add or deduct alternates <br />that wierie, lencluded for possible consideration,, These are listed as <br />f 0111ows: <br />1. Covered sial,t/sand storage area <br />2i *New brick, clou,rityard 'wall along Civic Center Drive and Woodhill Drive <br />3 ,, Extra landscape, plantings along the, new courtyard wall <br />01 0 <br />4. Second-story mezzanilnle storage area in new building <br />5. Outside veh.I'*cle wash-off areawith, sump <br />I (ji 91 <br />6. Clomplerion of rolofing replacement for the north wing of the public <br />works buildiLng <br />7. Dolor i nstalliation, and completion, of interior storage area for <br />existing water tank <br />