Laserfiche WebLink
17 <br />1 5 1 � <br />a a <br />required by revisions $57.00 $58.70 <br />Demolition Permit Fee: <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee (except for <br />single-family dwellings) to be charged and used to defray the cost of fire safety inspections (Ord. 1237, 3- <br />13 -2000, eff. 5-1-2000) <br />Grading Plan Review Fee: <br />Description <br />Current Amount <br />Proposed Amount <br />50 cubic yards or less <br />$54.00 for the first 10,000 cubic <br />$56.00 for the first 10,000 <br />yards, plus $27.00 for each <br />cubic yards, plus $27.00 for <br />additional 10,000 yards or <br />each additional 10,000 yards or <br />fraction thereof <br />fraction thereof <br />$297.00 for the first 100,000 <br />$300.00 for the first 100,000 <br />100,001 - 200,000 cubic yards <br />cubic yards, plus $15.00 for <br />cubic yards, plus $16.00 for <br />each additional 10,000 yards or <br />each additional 10,000 yards or <br />fraction thereof <br />fraction thereof <br />$444.00 for the first 200,000 <br />$457.00 for the first 200,000 <br />In excess of 200,000 cubic yards <br />cubic yards, plus $8.00 for each <br />cubic yards, plus $9.00 for each <br />additional 10,000 yards or <br />additional 10,000 yards or <br />fraction thereof <br />fraction thereof <br />Page I I of 20 <br />