Laserfiche WebLink
1�(',� 1� <br />) 7 <br />1� 6 8 <br />1 6 <br />1 7 <br />1� 7 1� <br />1� 7 2 <br />.Mechanical Permit Fee - Residential: <br />Description <br />Air conditioning - new <br />• <br />Current Amount <br />Proposed Amount <br />Air conditioning - replacement <br />Warm air furnace - new <br />Warm air furnace - replacement <br />Hot water boilers - new <br />Hot water boilers - replacement <br />Unit heaters <br />Swimming pool heaters <br />Misc. work & gas piping <br />1.25% ofjob cost <br />1.25% ofjob cost <br />Minimum fee <br />I If <br />Gas fireplace <br />.Mechanical Permit Fee - Commercial: <br />1 73 <br />1� 741 Moving Permit Fee: <br />1 7 5 <br />1� 7 6 <br />1 77 Plumbing Permit Fee: <br />ee: <br />1 7 8 <br />1� 7 <br />1 f: Plan Review Fee: <br />1 f ] 1 When a building permit is required and a plan is required to be submitted, a plan checking fee shall be paid. <br />1 f 2 Plan checking fees for all buildings, except for construction costs in R-I and R-2 zones which do not <br />3 involve new single family structures and are of less than fifteen thousand dollars ($18,000.00), shall be <br />„ < sixty five percent (65%) of the building permit fee as set forth in Section 901.06 of this chapter, except as <br />1� 5 modified in M.S.B.C. Section 1300. (Ord. 11109 4-13-1992) <br />1� 6 <br />1 8 8 The plan review fees specified are separate fees from the permit fees specified and are in addition to the <br />Page 13 of 20 <br />