Laserfiche WebLink
I <br />REQUEST FOR COUNCILACTION DATE: <br />11/13/90 <br />ITEM NO.: 4,h <br />Department Approval* Manager Reviewed. <br />�t a� <br />a a 411"Ity study and schedul" 1 <br />r-tem Diescrimption. Receipt of feasib 1, 1 ing of public <br />0 <br />hearing for County Road B. Project No. ST-P-SW-89-17 <br />a 8 <br />10 <br />The second report, prepared by the Clty of Roseville, is a synopsis of th <br />1i <br />most recent, informat ion related to this, pro! iect. it is hoped that this <br />a 0 <br />report wiiloll clearly outline those issues most important to Roseville. <br />A neighborih,olod meeting 'wasi held on May, 8 If 19 9 0, to present the approved <br />design,, For the most part, the design as approved by council was well <br />received . <br />1i 0 <br />it is requested that the councilreceive the most recent feasibility <br />report which includes the approved roadway section and schedule a <br />public hearing for this project at the regularly scheduled council <br />meeting of December 1,0, 1990o <br />zic <br />V # <br />Adoption of a resolution receiving f eiasib 10lity study for Proj ect No <br />I <br />S'T�P-SW-89-17 and schedulillng a public hearing for December 10, 19900 <br />