Laserfiche WebLink
a cfe 3 <br />off <br />90�-16 <br />12/10/9111 <br />V a <br />the city council,,, If the, project "is abandoned, the engineering costs <br />will, have to be financied by the city on, an, 'interim basis using city Pm:!- <br />N�ond funds& When the prolect loroceeds "in the future, engineering costs <br />4ft <br />,could, be 'included in the project financing and reimbursed at that tiffime <br />fram, ULSA sources. <br />p <br />St,af f recommenidat3 1 .all 1ICI .2 Staff still believes that this project is in the <br />rtest interest of' the cil'ity, and, recommends the council order the construct-10 <br />of city project, 90-16,, Lincoln Drive/Cou,n,ty Road C-2 improvements, <br />Representatives f'rolm,S,EH will be present at the hearing to discuss the <br />four items, previously sted., We suggest the council use the attached <br />script, to conduct, the public hearing,,. <br />UO I I I � 11, <br />111111111 1lrq� lm� <br />d,op l�t 0 is "41 <br />A ion of resolution ordering proj�ect 1► W-Pi-90-16, construction • <br />,a 1i <br />I Lincoln, Drive from Terrace Drive to County Road C-2 and reconstruction <br />4i <br />of' County Road CI-2 from Lincoln Drive to Snelling Avenue. <br />