Laserfiche WebLink
The property where the post office 'is supposed to be, located, thos, <br />vi <br />zoned Industri,al, is indicated on the Comprehensive Plan as Busines <br />Development. If the land were zoned in a biulsin�esis category, th <br />parking setback in the front would be 15 feet. Thus, the curren� <br />proposal 'is 3 feelt greater than wou�ld be normally required in a Busines <br />'You will note too, that in the curreint proposal, there is no requests for <br />a setback to the side yard on the east side of the structure. Here <br />curbing and landscaping will be installed. <br />The, staff reviewed the condition of the exterior of the structure and <br />found that the three sides of <br />the buildli,ng have been stuccoed with a <br />rough texture, ands that the stucco <br />is in excellent shape. There are <br />existing expansion j in the <br />stucco which is a, common practice in a <br />well dloine stucco job. There apipiear to be no cracks in the building as <br />it currently, exists. 1 T'h�eriefore, <br />if' one w,e�re to change the building to a <br />brick exteri,lor, this wou�ld be <br />very difficult because there is no brick <br />ledgle at the base of' the structure to receive the brick. Thus, it would <br />appear reasonable to pressure <br />clean the existing stucco, and paint the <br />entire building, perh�aps, a soft <br />gray color. This would then in fact, be <br />similar to a new post office <br />riecently built in Fort Meyers, Florida, <br />where the structure was done <br />very attractively in gray with a minimal <br />y <br />use of blue trim. 1 You will <br />notice in the drawings presented that a <br />new entrance is pr,o�poised at <br />the northeast corner emphasized by a <br />