Laserfiche WebLink
Because of these construction projects,, we are deferringi paviing�, the remainde <br />of thel, improveld ariea. i <br />We havie diesignateid on our, site plan., three areas being heild in reserve for <br />the ablove three future land requirements. This, will still leave us with about <br />1/3 of our total, property available for continued future growth, <br />We are pile,ased to be in Rosevil"Ile, and pilan continued growth of our operations <br />terie. <br />We resplectfully request issu�an�ce of the, sped al use permit rlelquelsted in the <br />application of which this letter is a, part,. <br />Very, truly yours., <br />A* G. HALE <br />Vice President/General Manager <br />I it <br />