Laserfiche WebLink
de <br />i 61 1.-1 Ift <br />raawUEST FOR COUNCIL ACTION DATE: 9/ 11/ 8 1_1 <br />Msnag' er,Revilewed. <br />1111111111111110 1 <br />Moro <br />II Dr-T-7-10 4-L, P It 1, o n V Change Order No. 1 for 1989 Contract 3 <br />IN <br />,This contract involves the construction of the Rose Place cul-de-sac <br />I <br />from Lexington Avenue to the west and the construction of the County <br />Road C-12 cul-de-sac contiguous to the, north side of The Lexington <br />Vi <br />proj�ect.-,-, The work is being done by Midwest Asphalt Corporation of <br />4 <br />Hopkins, Minnesota. The contract is being administered by Short, <br />Elliott,, Hendrickson of St. Paul, Minnesota. <br />11 <br />in additilLon to those "items included "in the contract, the contractor was <br />0 <br />requested by the publicworks staff to, perform the following. <br />Construct an 8411 diameter manhole over existing 4811 storm sewer lon <br />Rose Place IS <br />2 Pressure and conductivity tests on ex Isting wate=aln and servicesp <br />The construction of the new manhole was done to replace an existing <br />a a a <br />manhole which had previlously been incorrectly installed. The watermain <br />,and se,iry ice test ing were done at the, request of the developer on the <br />01 <br />south si i de of 'this, prol.. ect and will be added directly to hi's <br />assessments, <br />The above listed work will add $5,330 to the initial contract amount <br />4 <br />increasiLng, the original contract amount from $101,,128 to $106.,458, No <br />time, extension 'is required for the above work,, <br />Vi! <br />Adoption of a motion approving Change, Order, No. 1 for 1989 Contract E 'in <br />the amount of $5,,3310,, <br />a <br />