R—EQUEST FOR COUNCIL ACTION DATE64 9/25/89 <br />a <br />Depart P <br />ment Apipr,v I . , Manager Reviewed: <br />7,/ <br />ITEM NO.: - I c> <br />=40 <br />Item Desicroni: Change Order No. 2 for 1989 Contract A <br />t(ITT—Is "o-11111" <br />In add, itillon to those items included "in the, contract, the contractor was <br />0 <br />L,wequested, by the public works staff to perform the following, <br />Install, 3301 of 1211 RCIP pipe, three manholes, one catch basin <br />and <br />replace the, disturbed curb and, blacktop on Shorewood Lane north <br />a <br />of' Lydi,a Avenue-,40I4.47. <br />2 Install the,, keystone retaining wall material prov luded by the. cit <br />around storm sewer lift station on, Millwood Avenue..$746.00. I <br />The ablove storm sewer, work on, Shorewoold Lane was performed at the <br />request of' the street superintendent to correct an existing segment of <br /># 0 <br />storm sewer that had failed. Theis work was outside the original limits <br />sif constructilon and, will be paid for with storm utility funds, <br />The installat lion of the, cholcolate-brown keystone wall in front of the <br />storm sewer lift statision ► Millwood Avenue was requested by staff to <br />improve the appearance of the lift station. The city utilized excess <br />keystone material stored 'in its yard to 6 <br />accomplish thiso Labor costs of <br />1 1, be, addled to the total Project cost. <br />W <br />The, ablove !ilsted work will add $15,150-47 t,ol the 'Initial contract amount <br />increasing the originial contract from $1,rI0611808,6041 including change <br />0 Is <br />sirder No, 1,i to $1110611967*85. No time extension is required for the <br />zh,a,nge order In <br />1 *4 <br />al a # <br />Adoption of a motion approving Change order No. 2 for 1989 Contract A 'in <br />the, amount, of' $115j,150,4740 <br />