Laserfiche WebLink
1n%91 I <br />&%JQQUEST FOR COUNCIL ICTION DATE: 11/13/`83;r' <br />Manager Reviewed. <br />M <br />Item Description: Change Order No. 4 for 1989 Contract <br />In addition to those items included, in the contract, the contractor was <br />N <br />r1equestied by the, Plu,bili,c Works staff' to perform the following: <br />Adjust and repair water valves as directed by engineer. Durin <br />constructionl, because of changes min grade, 'it was necessary to <br />0 a <br />relocate and, repair a number of valves found to be deficient. <br />2,. Relocate yard light to facilitate reitaining wall construction at <br />7,81, County Road B., <br />3,,, Additional, liandscaping work at 12,2i5 and 1233 County Road B,. <br />'This work, included the reinstallation of landscape rock behind the <br />new, fence which, was built as part of the County Road B project. <br />I <br />4,. Reset fence at 91 County Road B, dule, to the relocation of fire <br />hydrant . <br />