Laserfiche WebLink
I I <br />Date& Decernber 71, 19&1�1 <br />U <br />1i <br />The staff' has, been working over the past several months to <br />develop a, seit of plermittil"nig criteria for dealing with the issue <br />of disposal of' petroleum contaminated slovil. We have discussed <br />0 a a ft <br />this matter an, numerous, occasions, wirn the council 'in the past, <br />1. Whether to allowi treatment of contaminated soil at a! <br />within the ciety,. <br />2. To allow, sxte treatment only, or allow import of off-site <br />contaminated soil and off-siite treatment. <br />I di <br />,3. Determination of acceptable treatment processes, <br />0 id <br />Establishment of plerm. 'it condi, tions <br />Following advice olf the,, city attorney, it is suggested that each <br />permit request submitted, during the time in which the criteria <br />are being developed, be, coinsidered by, the council individually. <br />i I <br />'The equipment will be, descir'bed in greater detail at the <br />li 0 <br />work siession. However, -iti involves a small unit similar to a <br />it <br />bituminous batch plant.1 it is portable and 'is transported to <br />theii site, 'The soil is fed 'into a conveyor hopper and 'is burnel <br />