My WebLink
|
Help
|
About
|
Sign Out
Home
1989_0522_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1989
>
1989_0522_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2011 10:12:11 AM
Creation date
11/21/2011 10:00:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Till I <br />rem <br />i� <br />4* Summary <br />In summary, it applear's that the basic coincept for expansion and <br />i , rmprovement for the centier are sound. There remains the review of <br />splecific conditions to be detaliled that could include: <br />a) <br />Engineering and', <br />utility Plans and specifications; <br />b) <br />F'inal plans, for <br />grading and landscaping; <br />Bill <br />Usle of building <br />materials and sign�age; <br />id) <br />w w <br />w ills <br />e) <br />Interim' traffiC <br />AL <br />f) <br />Maintenance of <br />interim drainage facilities; <br />dW <br />Dedication of additional right-of-way if' are and <br />h) <br />Delineation and <br />construction of pathway system. <br />Kill R 0 a M <br />4* Summary <br />In summary, it applear's that the basic coincept for expansion and <br />i , rmprovement for the centier are sound. There remains the review of <br />splecific conditions to be detaliled that could include: <br />a) <br />Engineering and', <br />utility Plans and specifications; <br />b) <br />F'inal plans, for <br />grading and landscaping; <br />C) <br />Usle of building <br />materials and sign�age; <br />id) <br />Han�dlin f' trash <br />receptacles and scireening; <br />e) <br />Interim' traffiC <br />management and conitroll; <br />f) <br />Maintenance of <br />interim drainage facilities; <br />g) <br />Dedication of additional right-of-way if' are and <br />h) <br />Delineation and <br />construction of pathway system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.