<br />Item Description; Riesiolution awarding bids, 1989 Pavement Management
<br />Program Contract A,, Project P-89-02., Nei'Lghborhood
<br />and 8, P-819-03,r ST-89-09, ST-89-15,
<br />Wilder,, Wheeler, Stanbridge, Aldine, Lydia, Mildred,
<br />street reconstruct,ioln and storm sewer installation
<br />,As with the other, proJects opened on April 19, we are again pleased t
<br />report that bids for this contract were extremely competitive. We
<br />received n ine bids ranging from a low of $1,061,808,.04 to a hingh of
<br />$1,,657,039,,219., Our engiine,er's estimate for the projects was
<br />$1,,446*837,11., 'The low bid submitted by, T, A,. Schifsky and Sons
<br />Contracting is, 27% below the engineer's estimate, In dollars this lol
<br />We have checked, the references for T,. A.1 Schifsky and Sons and their
<br />proposed subicontrac,tiorsi, and we find the results to be acceptable,, We
<br />have worked with Tli A., Schifsky and Sons 'in the past and have found
<br />their work record to be very goodw Accordingly, we recommend that the
<br />[i ed be aw,ariid,ed to T. A., Schifsky and Sons in the amount of
<br />$110611808,wO4*