Laserfiche WebLink
To Steven D�. Gatilin, Public Works D31m-rector <br />i <br />From.* Karl P Kieel,, Assistant Public Works Director <br />Re: County Road B, non-mlotorized pathway neighborhood meeting, <br />April 61 1989a <br />Date: Apr il 7 j, 19 8 9 <br />The following is a list of' questions, or issues raleseds. <br />IS, V I =Aq I Z <br />10i Strong sentiment expressing, the need for some type of <br />pathway was, violiceldI <br />2. A staitement a that avid bicyclists do not actually <br />use pathways, due to the many obstacles,, dirt,, and debris, <br />3. Has, a study beein completed to see how many bicyclists <br />actually use the pathway system?i Steve went over the <br />survey that, was, done but tihei, gentleman asking the question <br />disputed the findings. <br />Why does the boulevard have, to be 4 f eet? Could it b <br />less? Grass will not grow there anyhow, i <br />Why, do we need, an 8-foot pathway.) Eight feet seems like <br />■ bit much . <br />R The riesident on the north side with the large cluster of <br />,oak trees voiced concern about loosi-ng those trees. He <br />would like to inviestilgate moving the path behind the trees <br />IN <br />in ordier to save them, <br />if <br />