Laserfiche WebLink
01 <br />Jth a Upon proper execution by New Br igbton and the <br />State, the EVP System o existing, traffic control signal on <br />L' <br />Brighton. <br />19,6 Upon pr oiler execution by Roseville% and the State, <br />the MVP ' stem for the existing traffic. control signal on Trunk <br />Highway No. 35W West Ramps at County, State Aid Highway No. 19 <br />�(Cou,nty Road, D) shall become a part. of' the S ignal Maintenanc'.,V <br />10 <br />Agreement No. 17'89-,R between Roseville and the State cover:Lng <br />a <br />operation, revision,, mainteniance, and removal of EVP Systems by <br />State, forces at the cost and expense of Roseville, <br />10 The construction work, pr,ovided for herein shall be <br />under the dirlect,ion and supervision of New Brighton, it is <br />