Laserfiche WebLink
City of Roseville 2012 Fee Schedule <br /> Manufactured Dome Permit Fee: <br /> Description Current Amount Proposed Amount <br /> New installation $ 257.50 $ 260.00 <br /> Mechanical Permit Fee - Residential: <br /> Description Current Amount Proposed Amount <br /> Air conditioning-new $ 44.50 $ 45.00 <br /> Air conditioning-replacement 56.50 57.00 <br /> Warm air furnace-new 94.00 95.00 <br /> Warm air furnace - replacement 56.50 57.00 <br /> Hot water boilers-new 94.00 95.00 <br /> Hot water boilers-replacement 56.50 57.00 <br /> Unit heaters 56.50 57.00 <br /> Swimming pool heaters 56.50 57.00 <br /> Misc. work& gas piping 1.28% of job cost 1.28% of job cost <br /> Minimum fee 56.50 57.00 <br /> Gas fireplace 56.50 57.00 <br /> In floor heat $ 56.50 78.00 <br /> $1.28 % of job cost $1.28 % of job cost <br /> Solar panel installation / $150.00 min fee / $150.00 min fee <br /> Mechanical Permit Fee - Commercial: <br /> Description Current Amount Proposed Amount <br /> 1.28% of job cost/ 1.28% of job cost/ <br /> All commercial work $56.50 min fee $57.00 min fee <br /> Moving Permit Fee: <br /> Description Current Amount Proposed Amount <br /> Over private property only $ 85.50 $87.00 <br /> Over public streets 125.00 127.00 <br /> Investigation fee per hour $63.55 $64.50 <br /> Plumbing Permit Fee: <br /> Description Current Amount Proposed Amount <br /> Administrative/minimum fee $ 56.50 $ 57.00 <br /> Additional for each fixture opening 10.00 10.00 <br /> Miscellaneous work 1.28% of job cost 1.28% of job cost <br /> rBackflow prevention verification $ 26.00 $ 26.00 <br /> 10 <br />