My WebLink
|
Help
|
About
|
Sign Out
Home
2011_1128_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_1128_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2011 4:16:09 PM
Creation date
11/22/2011 2:00:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2012 Fee Schedule <br /> Sewer Connection Permit Fee—En ing Bering: <br /> Description Current Amount Proposed Amount <br /> Residential $ 5.00 $ 5.00 <br /> Commercial 25.00 25.00 <br /> Repair 5.00 5.00 <br /> Disconnect—residential 25.00 25.00 <br /> Disconnect—commercial 75.00 75.00 <br /> Sign Permit Fee: <br /> Utilize building permit fee schedule. No plan review fee <br /> Description Current Amount Proposed Amount <br /> Permanent Sign—minimum fee $ 55.00 $ 55.00 <br /> Temporary Sign 25.00 25.00 <br /> Swimming Pool Permit Fee—Planning & Zoning_ <br /> Description Current Amount Proposed Amount <br /> Residential pool $ 194.00 $ 197.00 <br /> Utilize building Utilize building <br /> Commercial pool Permit fee Permit fee <br /> Swimming Pool Permit Fee—Engineering: <br /> Description Current Amount Proposed Amount <br /> Residential pool $ 15.00 $ 15.00 <br /> Commercial pool - - <br /> Water Connection Permit Fee—Planning & Zoning <br /> Description Current Amount Proposed Amount <br /> Residential $ 86.00 $ 87.00 <br /> Commercial 276.00 280.00 <br /> Repair 56.50 57.00 <br /> Disconnect—residential 77.00 78.00 <br /> Disconnect—commercial $ 155.00 $ 157.00 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.