My WebLink
|
Help
|
About
|
Sign Out
Home
2011_1128_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_1128_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2011 4:16:09 PM
Creation date
11/22/2011 2:00:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2012 Fee Schedule <br /> O. For inspection of transient projects, including but not limited to, carnivals and <br /> circuses, the inspection fees shall be computed as follows: <br /> Power supply units according to Item "B" of fee schedule. Alike fee <br /> will be required on power supply units at each engagement during the <br /> season, except that a fee of$35.00 per hour will be charged for <br /> additional time spent by the Inspector if the power supply is not ready <br /> for inspections as required by law. <br /> Rides, Devises or Concessions: Shall be inspected at their first <br /> appearance of the season and the inspection fee shall be $35.00 per unit. <br /> P. The fee is doubled if the work starts before the permit is issued. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.