My WebLink
|
Help
|
About
|
Sign Out
Home
1989_0327_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1989
>
1989_0327_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2011 9:37:01 AM
Creation date
11/23/2011 9:28:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM <br />C*-389 <br />City of RoSevill- <br />MC <br />January 16, 1.989 <br />laboratory for volatii,le organic compounds (VOCs), total <br />01 <br />hydroicarbions calculated as gasoline,, methyl tertillary butyl ether <br />QTTBE), and, lead, accoraing to EPA or other standard methodologies. <br />a <br />These analyses are in, accordance with, the currently required MPCA <br />analyses for Petroileum release sities. Normal turnaround tiome for <br />chemical analysis is four weeks. <br />1:2fMOOIAS 0 . I <br />The, estimated coistis for the 4 days (5 borings) to 7 days (10 <br />0 -Al <br />bor ings), of so 11"l bori ngs outlined, in, this proposai. includ ing the <br />presence of an environmental geologiist for on-site activities, <br />drng and sampling are $6,8214 to $11r673- The range in the <br />10 Mi <br />proposed, number, of soil borings is due to the unknown subsurface <br />conditions at this site, <br />o <br />ora <br />Labltry analyses of' three soil, samples for the parameters <br />pi q 0 1 <br />indicated in, the scope of slervicesi i" s $1,107 <br />Monitoring well, insitallati'Lon costst *Including the presence of an <br />1 <br />environmental g,eolloigiosti for on-site activities, sampling and <br />atioring well materials are $7,1254 <br />moni <br />Laboratory analy s,is of three groundwater samples is $1,145 0 <br />Costs assiociated with project corriespondence, supervision,, and <br />report preparation are estimated to be approximately $3,100. <br />do 6 <br />The,, tiotial projectied cost for the field work, sampling, analvses and <br />report I'S $11,0131, to 15,,880. if monitoring wells are necessary, <br />the total, projected colsits are $1191,,301 to 24r150e This cost <br />estimate 'is, valild for work authorilized within 60 days and will not <br />be exceeded, by more than tien percent without additional <br />authorization <br />IV <br />kO <br />q <br />e- <br />Ok <br />ri <br />
The URL can be used to link to this page
Your browser does not support the video tag.