Laserfiche WebLink
lb. Local Standpiple <br />Feet High x 20 Feet Diamieter Steel Standpipe, Altitude <br />rid Check Valve and Vault, <br />Estimated Construction Cost 140 , 000 <br />The criteri ► used ire selecting the recommended solution ere <br />Reliabilit y <br />Construction Cost <br />Operating and Maintenance Cost <br />Using the criteria above., the solutions can be _ • _. • th <br />best solution determinediiii, In the ranking 1 is the lowest rankin <br />and 3 is the highest ranking. I <br />Separate Pressure <br />1b. Local Standpiple 3 <br />• A. A. r <br />i <br />Control <br />Construction & <br />Cost Cost Total <br />3 <br />Another way of looking, at consider <br />• disadvantages <br />l, a ,. Sepiarate Pressure done <br />Advantaige Raises the pressure in the area above the <br />present pressure <br />D di Mai Inuously so that power <br />is being w, ewatermains, ,. required <br />means some disruption in the area. Maintenance is spread <br />out over a, large .. <br />