My WebLink
|
Help
|
About
|
Sign Out
Home
1989_0227_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1989
>
1989_0227_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2011 11:35:53 AM
Creation date
11/23/2011 11:29:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 22., 1989 <br />vie-M -491 <br />IFROM: Bob Bleirs,chiel"id, <br />0 <br />RE* Antpated Expenses for Special Election <br />01 <br />Listed, below are the an,t q IC <br />i 1piated costs of holding a special <br />election, foripark,and recreation issues: <br />VOT11=41 <br />Thei anticipated costis for a special ele'dition is $3,950. <br />(See attached breakdown.) <br />I <br />0 a 0 <br />The, ciolst of' printing an eight page ref erendum brochure explag <br />the questions, is approxid,mately $21800* This includes the cost of <br />paper and pr 'lint inigi The brochure.will be typeset in-house on our <br />new desk top publishingi system, The cost of mailing will be <br />1 40 <br />ab si ol rb e & d, by combining the C 16ty Newsletter and Parks and <br />R,ecrileatio�n Brochure for April .1 <br />in <br />Revisions of Architectural D�ra,wing,4 <br />Attached a' <br />is ain outline from architects, RSP,, outlining the cost <br />of ft upidat 'Ing the arch itectural draw ings As noted the cost for <br />thils update would be $6,001, <br />D) Model of Community and Culture, Cente.-r- <br />0 2 1 1 <br />Park, Super, 1 nitendent, Paul Olsonif, who, has training and experience <br />a <br />in developing models, will be constructing a model of the <br />proposed,i Community and Culture Center. Cost for supplies for <br />1 <br />this prolect is anticipated to be approximately <br />The, approximate anticipated cost for the spec-l"al referendum would <br />be $71 650,w These mionies would need to be approriated f rom the <br />contingency fund, for, 19189. <br />
The URL can be used to link to this page
Your browser does not support the video tag.