Laserfiche WebLink
4 <br />Justify-ing the�, need for a 4-ilot development <br />LILstied bellow are the costs for develop-ing Dove Park: <br />utimi lit Ole s <br />4,51 9 0 01 C1 <br />Engineering <br />3', OOCJ <br />Land costis <br />5 719 61 51 C1 <br />Real, Estate 'Ta,x,e�s <br />50 <br />Title Inisurance <br />510 <br />Insurame <br />1�00' <br />Legal Fee, <br />701 <br />Surveyl*ng <br />2�001 <br />Appirial'sal Fee <br />40 <br />Eros "loin Control <br />11,00 <br />Telephone Tarr iff <br />1700, <br />Trees <br />901 <br />Street Signs <br />10i I <br />Soil Tests <br />50 <br />Sitre,eit Lii,ght <br />1 <br />11519,750 <br />I,f four lots were developed, the cos,t would be approximately <br />$,28,93,7.50 pier lot., If three lots were developed, the cost <br />woulid. be, a y $88,583.30. <br />pproximatel <br />