Laserfiche WebLink
City of Roseville September 29, 1,988 <br />Audio & Video Systems Overview <br />Jamieson and Associates, in�c. Commission, 88599 <br />V. SUMMARY COST ESTIMATES, <br />Jamieson and Assocloa,t,es, inc. was rlequested, to proviide cost estimates <br />0 0 di <br />for the audiovisual equipment portions of its recomendations., Obviously, <br />f'i�nal costs will depen�d on the detailed, design and the normal range <br />zxperienced in competitive bidding. <br />1W <br />Therefore, in the next ph�a,se of this process, we would, anti cil pate a <br />a <br />d,evelopm�ent process, which looks at three key elements. <br />* Prioritized performance ca,pabl*�l�l'�ties,/f'ea,turies, desired. <br />al <br />Potentially available funding sources and levels., <br />Integration of' m�ultip�le capabilities through shared hardwarei. <br />To help in th,e piroicess, the following are anticipated cost rain�ges for <br />the key elements above, based on an assiump�tion that they would be, <br />W <br />implemented essential�ly in the oirder listed,, <br />1. SOUND SYSTEM REVISIONS.: $2111000 1- 28,9000 <br />