Laserfiche WebLink
REQUEST FOR COUNCIL ACTION DATE: 11/28/8g <br />0 <br />Co,epartment Approval Manager Reviewed: <br />R <br />ITEM NO. <br />Pi <br />Item Descript lion: Preparation of feasibility report, water system <br />a <br />improvement—Lovell/Westiern area Pro"ect. No. W-89-12 <br />:At the November 21, 19,88, work session, the council discussed the need <br />a 9 4 <br />to proceed, with an engineering study for water system improvements 'in <br />0 <br />the Lov,ell/Wes�t,eilrn/Toph'l',1,1, Circle neighborhood. The problems with the <br />11 <br />c itvlls water, system in the area were discussed in detail during the <br />consideration for the Concordia prollect. <br />At the work sess ion , the council d 10rected staf f to proceed with the - <br />study accord ingi tio the scope of seriviciles submitted by the consultant,, <br />I <br />It is anticipated that a study can begin by December 1, 1988,, with <br />p I <br />!I +r relllminiary findings available by mid-january. <br />Adoption of' a 'resolution. ordering the preparation of a feasibility <br />report for watier system "improvements in the Lovell/Western area. The <br />consultant selected to do the study should be designated as Short, <br />Elliott, Hendrickson,, Inc. <br />