416 6 I %,
<br />AW,
<br />M Does any part of the project a,t Involve:
<br />a 7
<br />shoreland zoning district.
<br />n7
<br />b., delineated 1,00-year flowed l .1 d pla
<br />C. state or federally designated river, land use district?
<br />If yes,, lidentify water body, and a pp licable state classification(s). and describe m
<br />to protect', 'water and, related land resources: easures
<br />.R90 Describe any physicail alteration (e.g.. dikes, excavations fill, s�trea,m diversion) of any
<br />drainage systeml., lake, stream, and�/or wetland. Describe measures, to minimize
<br />pairment, of the water -related resources. Estimate quan,tity of material to be dredged
<br />I I
<br />and ind,t"cate where Spoils will be deposited.
<br />None
<br />2,0* 4
<br />a-Will the project r,equire an appropriation of round or, surface water? If yes, explain
<br />W,
<br />(i�nidlicat,e quantity and, source),
<br />b-Will the project affect groundwater, levells in any wells (o ff he siteR if yes ex.
<br />plain:11 norD t � 0 4,
<br />Ef
<br />1
<br />W
<br />■
<br />El Yes
<br />&P
<br />o ■
<br />0 dP%
<br />a. Willtheprojectg1enerate:
<br />L su'rfac'e and) storm,wate�rrunoff?
<br />sanitary wastewater'A
<br />3,0 'Industrial waste►atier?
<br />41, Cooliong water, (cantact and' noncontact)?
<br />If Yes, identify sources. volumes, qua,lit,y (if other, than normal domestic sewage)
<br />and treatme basis methods. G�ive the bass, or methodologY, of estimates,, ,,
<br />See xhibi 1* t #8
<br />ble Id'entifyrec�elliviingwaters,,Iin,cludin
<br />g groundwater, and, evaluate, the impacts of the
<br />discharges listed above. Udischarges to groundw'ater, are ant ciplated . provide per.
<br />I
<br />cola filon/permeabili ty and other, hydrogeo logical test data, if available.
<br />See, Ex'hibilt #,8
<br />Willthe project gen�erate ('either during or after construction):
<br />low Z
<br />a. air pollution'.?
<br />b. dust?
<br />C. noise?
<br />d. odors?
<br />A.
<br />If yes, exp I ai,n., Incl ud i n gi -as a p p ro p ri a te: distances to sen,s i i I We I a n d uses; ex pec te d I ev.
<br />els and duration Of noise; types and quantities of air pollulanis from, stacks, mobile
<br />sources, and fugitive emissions (d�u�st); odor sources; and, miligati
<br />4 We measures for any
<br />impacts. G'ive the basis or methodology of estimates.,
<br />See, Exhibit #,12
<br />Oil ■
<br />RV
<br />F65 .
<br />Li
<br />■
<br />c�
<br />
|