Laserfiche WebLink
1986 to 1 991 Non-MOTORIZED PATHWAY <br />A, <br />3/26/86 <br />(only projects using it; a dg ted <br />Winds) <br />CV1, <br />Increase <br />or <br />Funds <br />Decrease <br />Available <br />AS OF <br />12/31/815 <br />$ 217 , 0 0 0 <br />1 <br />1986 Budgeted Funds, <br />, 0 <br />284j000 <br />Bi�12 from Snelling to Lexington <br />(50r000) <br />2349000 <br />Haml,ine from, B t -2 <br />1 t <br />2169000 <br />91 B from Cleveland t'o Snelling <br />( , 000) <br />X00 <br />150000 <br />from Grotto, to l e <br />(159000) <br />135,000 <br />from Lexington to Victor <br />(1 5000) <br />120,000 <br />1 <br />1 987 Budgeted Funds <br />6T9000 <br />187,000 <br />from nelli to Hazline (both sides) <br />(100,000) <br />87,000 <br />from Hamline to Lexin ton <br />,�i <br />54,000 <br />B,friom Lexington to Grotto <br />, o <br />61000 <br />1 <br />1 X 8 8 Budgeted, Funds <br />67,000 <br />7 9 t <br />Western from SO Owasso to C <br />(75,000) <br />(29000) <br />1 <br />1989 Budgeted, Funds <br />67,000 <br />65,000 <br />oselawn from Lexington ton to victoria <br />22, 000 <br />43,000 <br />w <br />Western from, -,2 to Lovely. <br />(109000) <br />339000 <br />1 + <br />1 990 Budgeted Funds <br />67,000 <br />1009000 <br />from Cohansey to Rice <br />(60, 00) <br />40,000 <br />1 1 <br />1 991 Budgeted Funds <br />67,000 <br />107,000 <br />Roselawn from Snelling to lin <br />(33,000) <br />7 , 000 <br />Cleveland from R,osiel,awn to B <br />(349000) <br />40, 000 <br />amlin+e from -2 to, <br />(33,000) <br />7,000 <br />