Laserfiche WebLink
l� <br />z-i 'U waiter, tight,, The findings of the moisture survey 21 r e no <br />are <br />included in i report dated attached. <br />117 11, S 0 0 <br />The i p ere ' Dynamit Nobel of America.. <br />I,nic.,i consisted of' insitiall Iiiiiing a layer of 1/4 inch separation <br />board ovie�r the ex2Lstingi PVC membrane (existing rock ballast would <br />be exisiting membrane cut free of flashing). <br />membrane A new PVC would be, installed lashing and the <br />ex1st,ing rock ballast would be reinsitalled,, A new warranty would <br />be P • <br />existing Thile proposed roofiling membrane is .,048 inches thick, where the <br />resistance iii punctures and spli,ts caused by expansion <br />contraction <br />reroofing Baseid, on reicent blidsi received for the roof replacement on the Ice <br />Arena anid Fire, Station #2,, the cost of F30-re Station #1 <br />either, <br />warranty, would, as l I <br />1. Built-up Roof ' , 200 ' . F. x, $2.,75/S.F. $1 , BOO. <br />.n le -F1 EPDM I/ ► 21010 S.F. x $ ,, * F, $23P400,00 <br />