Laserfiche WebLink
Page 5 <br />Lexincrton, EXO <br />�..'he project site. During the f-inal design process, the <br />z ■ ilabl,e, capacity of the existing lateral will need to be <br />v,al I <br />-=-valuated., Alternate discharge locations are available if <br />relcraireld. <br />