Laserfiche WebLink
Page 9 <br />Lexington EAW <br />-zewer system will be adequate to convey the expected sanitary <br />2 ilewage flows. <br />7. The air quality will be affected for a short period due to the <br />dust, generated from the construction, but this will be <br />I <br />relat I'vely mi,nor <br />2. Noinse, levels can be expected to be excessive during <br />a 0 a <br />construction, During construct.11on.. excessive noise will be <br />limited between the hours, of 7:00 am. and 10:00 pm,, on any <br />weekday, orbetwelen the ours of 9:00 a.m. and 9eOO p.m. on an <br />weekend or legal holiday as, stipulated min the city code, I <br />9. The proDect will elimignate, a, large portion of wildlife <br />habitat,, primarily urban spec i"es,, currently ex isting -on the <br />site., <br />P <br />Vol There are, no known histor i1cal or archaeolog ical resources on <br />the prio3 e,ct si" itie, <br />a <br />1 The proj e,cit i,ncludies the upgrade and dedication to the c 19ty 0 f <br />a <br />a currienti ii-tfor7uial b-all field. <br />U2.1 There are, no hazardous wastes anticipated to be produced, <br />a <br />C-3. The proje,cit is consistent with the comprehen <br />sive plan and the <br />city,*si tax increment plans for the area as most recently <br />'dered. <br />consi <br />