Laserfiche WebLink
At this,- time, it does n olt app © that actual construction Wi 11 <br />comence,wit,hin the six month time allotment for the fo�llow ing reasons: <br />I. Th�el final l�ea,se negotiations and drafting, of the <br />legal documents with Highland Super Stores and TJ <br />~ax x took longer than originally anticipated,. The <br />leases are now com�p,let,ed and are 1 1 n the f 1 i na,l I egal <br />review prlocei,ss, We anticipate these will be sign Ot <br />W <br />in the viery near future,, <br />