Laserfiche WebLink
0 6 <br />Department Approval Manager, Reviewed: Agenda Section: <br />Consent Agenda <br />Item Description: Petition from Mueller Bies Funeral Home for th <br />installation of stor sewer pipe in conjunctio, <br />With City Project 87-15B I <br />m <br />a <br />Accordincf to the owners, thi's wall was not built according to design. <br />As a, result it is steeper • than originally Planned* They expressed <br />c,on,ceilrnsi that doing wor <br />any i A& <br />Ii k,*nd of k involved with the ditch project <br />around this wall, may resiult in it collapsing,, <br />Aoweveri, the neixt step would be for the counicil to authorize the <br />preparation of a felasibility study so the details and costs of the <br />Ii in <br />project can be determined. <br />1' 2 <br />41 <br />Adoptiion, of a, resolution declaring the adequacy of a petition to provid <br />storm 0 <br />er Pipe, f ill, and appurtenances for Mueller Bies Funeral Home <br />and authorizing the preparation of a feasibility study,, I <br />