My WebLink
|
Help
|
About
|
Sign Out
Home
1988_0314_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1988
>
1988_0314_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2011 10:58:25 AM
Creation date
12/2/2011 10:52:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Approval: <br />C U/� <br />RCEJQUEST FOR COUNCIL ACTION DATEd: 3/14/81 <br />ITEM NO <br />• ak <br />i <br />Item Description: Fea,sl'Rb3l'-!'ty report and change order for McCarron <br />ditch, project,, 87-15 1 <br />At,th,eir last regularly scheduled meeting, the council ordered <br />I a <br />the sita,ff to Prepare a feasibility study concerning work in and <br />around a retaining wall on the east Property line of Mueller Bies <br />Funeral Home at . the intersection of County Road B and Dale <br />S tr,eet, . <br />1. Ad op io <br />tion of a resiolu�tj & a <br />n receiving, the feasibi lity report and <br />ordering -improvelmient M-88-09. <br />2. Ado tiloin of a reisiolu�t," <br />P ion approvi,ncr, the plans and specificatio <br />■ <br />ns for <br />proij�ect, M-8-09. ff <br />30 Adoptioln of a motion, " <br />instruct ing staff to negotiate a change <br />order in accordance with the feasil"bi'LlitV study so the contractor <br />I& <br />performing the Lake M'cCarrions ditch Project can also Perform this <br />reiltia,i,ning wall wiork. <br />
The URL can be used to link to this page
Your browser does not support the video tag.