Laserfiche WebLink
]RIEQUEST FOR COUNCIL ACTION DATE69 1 <br />Efo" <br />• <br />Department Approval,: Manager Reviewed: Agenda Section: <br />Consent Agenda <br />The second contract known as Contract B covered Neighborhood <br />Once again twelve bidsi were received,, The low bid in this case was <br />$325f927*90 from Ci S. Mc,Crossan Construction. This bid was $117,000 <br />under the engineer's. estimate, <br />The last contract identi f I'Led as Contract C was for work on improvement <br />'I <br />Neicrhbiorhoold Nos. 14 and 29 and was, b'd by 15 contractors, T. A* <br />Schil'fsky and, Sons, againt presented the low bid with this bid being <br />4 <br />$3130,621.516.i In this case,, the bid was, $90,000 under the engineer's <br />lest imate . <br />Each of the, low bidideirsi mentioned above is an experienced contractor and <br />has done pro,je,c�ts in the past for the City of Roseville., The staff 'is <br />very pleased with these bildsy because combined they are approximately <br />$2821,0OO under the estimated cost or approximately 22% less than the <br />estimates # <br />A <br />of V <br />2 <br />Adoptlon of a riesolut "ion for each of the thriele contracts accepting tha- <br />I rl,! <br />low' bli.1.1 V <br />le Contract A consistlenig of Projects P-87-08 P--88-031 ST-88-07 <br />and a portion of P-88-02 tol T4P A,,o Schifsky and Sons 'in the <br />amount of $3119f260,o58o I <br />I <br />261 Contract B consisting of • portion of P-88-02 McCrossan <br />Construction 'in, the amount of $325,r927o90,s <br />3,o Contract C 11F of portions of P-88-02 to To A& Schifsky <br />and Sons in t,he amount of $330,621,51, <br />