My WebLink
|
Help
|
About
|
Sign Out
Home
1988_0425_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1988
>
1988_0425_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2011 2:18:39 PM
Creation date
12/2/2011 2:10:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the a bove fees, all transformers for signs and outline <br />lighting shall. be computed at, $4TOG $5,vi 00 fcar the first 500 VA or <br />fraction, thereof pier, unit, Plus 4010 . 010 for each additional 100 VA <br />or ftaction, thereof., <br />(0) Forl inspect-ion of transient Projectso including but not <br />lindtled, to, carnivals and circuses, the inspection f <br />e shall <br />Rides, <br />Concessions: '" inspected <br />their at <br />appeaxance of <br />inspection flee shall be $110v9G $1511111,00 pe-r unitiiii, <br />
The URL can be used to link to this page
Your browser does not support the video tag.