Laserfiche WebLink
REQUEST % COUNCIL ACTION DATE*. 4/25/8a <br />a A a <br />itiem, Dies crIpt. ion 1: Change Order No. A for 1■97 Contract G <br />As part of' t,h,e construictlLon last year in Contract G. 't was necessary tv <br />0 i <br />install a safety barricade and some landscaping at an ending point of <br />0 4 <br />oine of' the non-motorized pathways* This had not been anpated nd <br />01 <br />resulted in an added coist, of $4900 <br />This change. order even when added to, the previous three small <br />modiflications, resulted in a total change in the contract of less <br />than <br />I <br />Motion approving Change, Order NO, 4 for 1987 G in the amount of $490 ani4 <br />4 5 <br />authorizi,ing, the city-mania'gier and public works diarector to a n in behal <br />of the city. I <br />