My WebLink
|
Help
|
About
|
Sign Out
Home
1988_0627_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1988
>
1988_0627_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2011 3:47:15 PM
Creation date
12/2/2011 3:40:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Approval <br />tj Pa <br />QUEST FOR COUNCIL ACTION DATE: 6/27/82 <br />IX <br />Consent Agenda <br />Pi <br />16 <br />Item Description: Change Order No.i 1 for 1988 Contract A <br />a, <br />This contract involves street reconstruction on portions of Ryan Avenuemi <br />Cohansley Boulevard,, Bossard Drive, Irene Street, Sandhurst Drive, <br />Parrincrtion Streieti and Western Avenue. Also included is some storm <br />sewer work on <br />• portion of Farrington Street,, This contract was <br />trig3l-nally scheduled to be completed by June 27, 1988, <br />is <br />1-1;ue to the following reasons, the contractor has requested an extension <br />IF <br />sif twenty (20) calendar days to complete this project. <br />10'9 X410) � My 013 � � 163 � W � OW01910 Z E4 * * I <br />9 1 <br />Adoption, of a motion approving Change order No. 1 for time extension of <br />twenty, (12,0) calendar days for 1988 Contract A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.