Laserfiche WebLink
STEVE SAUNDEIRS13 CASE 17'19 <br />exercised to gain, access to this westerly half of the site when the <br />right, time cornes for development. As long as Mr. and Mrs. Halverson <br />own the entire site,, access will remain flexible. <br />51PI The staff has reviewed the development proposal a number of times <br />with the applicant's architect, Mr. Tome Gii,ven the objective, <br />it appears that the development plan as proposed is workable. The new <br />structure is a substantial irnprovemen,t over the existing building and the <br />new landscape plan wi,ll, substantially enhance the aesthetics of the area. <br />60 Attached IS a reduced copy of the site plan and copies of a picture o <br />the p age. We are happy to note that ther <br />i "It be no "swirling bucket"' an top of the pr,olp•sed building. You wi <br />w,I I <br />notel however, th�at a three dimensional "bucket" is proposed on top o <br />the pylon sign as, pictured.i I <br />Your engineering staff eixprelsised solm�e concern regarding the drainagz� <br />which Is not ad ely portrayed on th�e site plan attached. However, <br />Mr.i Dave janisch has met with th�e applicant's arichitect and they havv*.-' <br />i <br />comel, up with a successfu�l, solution. Storm sewer facifities exist in tha <br />area, and are adequate to service the property. <br />