Laserfiche WebLink
Contract for Professional Planning Services 3/16/87 Page 5 <br />X611*1 9 In y <br />The- work wil,l, bie performed according tio tihe following m�aximum costs anii <br />completion time, Each phase m�a,y be less an cost but sha,fl not exceed M; <br />0 <br />amount indicated.1 <br />Resieiarch�, analysis, <br />base map preparatio <br />Timem, 30 idays I <br />aL MIk <br />Consultation, wri, tng� <br />design, analys-is, <br />T I is <br />*mq* 15 days <br />Consultation,, design, <br />analysi draf ting <br />Time: '30 days <br />PHASE IV: IMPLEMENTATION <br />Consultation, writiong, <br />design, draf tinig <br />TOTAL SERVICES Phases I-I <br />11 1 <br />Estimate to be provided when <br />wei reach thi's phase and determine <br />th�ell type and sciale of' programs <br />and m�a,teriial,s to be developed. <br />PIH�ASE VI** FINAL REPORT (0 <br />Editing, pri,ntin,g, <br />binding, 1,00 copies <br />R <br />R <br />R <br />P <br />The work performed will, be charged for on a, timile plus materials basis <br />according. to the above, costs., Aill work and meetings wil,l, be computed in <br />accordance wi the Standard Rate Sichedulei attached hereto, which shal,l be <br />paid as hereinafter provided. <br />ff <br />All, costs incurred wi,ll bei Playable to tihe CON�SUL,T'A,NT upon receipt of an <br />a a <br />invioice showing the work completed and tihe cost, of said work,,, To each <br />invoicie not pailid within thirty d�ayis shall, be, ad'd�eld a serAce charge of' one <br />and one-half Percent (1.51 percent) per m�onth for each m�ont,h delin�quent.1 <br />