My WebLink
|
Help
|
About
|
Sign Out
Home
1987_0323_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1987
>
1987_0323_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2011 2:42:24 PM
Creation date
12/5/2011 2:37:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Approval <br />'!B'QUEi T FOR COUNCIL, ACTION DATE* <br />i is <br />Manager ]Reviewed <br />ITEM . <br />helm Description: Re u for noise or'di'nance variance for Snelling Avenue <br />reconstruction project <br />The, ordinance sets, the hours of 7*01010 a.m. to 10,00 pi.,m. on weekdays and 9.*00 a -am a tis <br />9 00 p m on y e e • s A copy of the • <br />nights It would, appear that some of the requests such as the one or two <br />special pipe crossing, cannot be avoided. The quiestion is then the benefits to be <br />derived by getting, the work done fla,site,r, by starting the work earlier in the morning <br />s s t Potential disruption to <br />the g i� � these � r times, <br />Denial el <br />request for variance to the noise l orld,inance in conjunction <br />With the Snelling Avenue pirol jest or <br />Approval of, a variance to, a noise ordin,a,nce of Section 207,020 (D) <br />for the Snelling Avenue project. Said variance would allow construction to <br />begin, at atm. on weekdays,, atm-iiiii, on Saturdays, and <br />on, Sundays, In addition, it would grant permission rt contractor to <br />wo,rik thrioughout the evieniling for a pipe crossing for a maximum of two <br />I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.