Laserfiche WebLink
FTI <br />In order to address the aforementioned situations, the <br />stiorm watier runoff from the site will be directed to <br />ponding iariea,s which will be designed to store five acre <br />1 accordance <br />feet gin a one hundred year event. Thus is in a <br />" w th the o fi f i c <br />i i-ally approved Comprehensive Drainage Plan <br />which antpated this type of development. <br />Averaging the three methods of analysis, it can be <br />ass''Umed that 42,,,,4i74 gallons per day will be eminating <br />f'rom the sitel. <br />V A, <br />In order to, properly address erosion and sedimentation <br />duringi construction, methods such as silt fences, diver- <br />L <br />silonary d j-kes, sumpis, etic., will be used to control <br />potential erosion, After construction,, turf establis <br />ment i arking surfaces, and roads wi a 11 ailevlat-zz <br />.. bu,'mlding, p <br />the possibilitv of erosion. <br />