Laserfiche WebLink
1*7 <br />0 <br />MIM 3,F 19817 <br />Page, 2 <br />on L-ind, use and zonixq change issues,, ccrMenciM Mid-July 1987. The City of <br />lRoseville. is interested "in Presentimg a land-use plan complete with a <br />proposed street system at the earliest possible dates Consequently,, <br />analysis of 'that land-use plan which, 6 <br />0 IS currently 'in draft form must <br />commence. U1 <br />i ..=-z: ., q, 1 6 #'.'Mi <br />Isisuies c*md concerns that, have bearing on the proposed street system study <br />and analysis are as follows: <br />ls What will ble, tihe general impact of development, traf f ic and <br />implementation of' new road systems in the area generally north of <br />Oxnty Pxed C and east of !-35W! <br />2061 What can be done wi*th the interchange at 1-35W and Cleveland Avenue <br />with additional access demand and with the intersection of County Road <br />C,. and Cleveland Averme icurzvntly cperating at the Level of Service E? <br />is it feasible to, relocate tliei ramps, further north in view of the. <br />existing drainage wetlands area and the lack of a roadway system to <br />I <br />ccmect to 3 1 n that area? <br />What i's the east-west,travel demand in the study area and 'is it <br />destinat, im-.10riented, or through traffic? <br />440 'What is the nec,eiss, ilty and/or, feasibility of developing north-south <br />connie i <br />ct IN ng streets from, Oakeriest across County Road C, for instance, <br />extending Prior north across cl <br />ountY Road C*11 Are there topography <br />prcblemsi in develpping these, rx)rth-south ccmng& iM streets? <br />61 <br />What is the status and the future of the railroad spur immediatel <br />south of County Road C and how will it 0 traffic operations? I <br />Ac <br />4-al What, will, be the access, requirment for the pIC terminal area? This <br />area isocas' <br />0 keyfuture development land. <br />7* Should the Space Centex north of tbe, :Uncoln develcpmerrt be crossed by <br />roadway and how a=ad that roadway be configured to provide cpts <br />develcpableparcels? Inum <br />9 <br />8V What will be the projected traffic viOlUme to the year 2000 on th <br />street network within tbei istudy area? i <br />