My WebLink
|
Help
|
About
|
Sign Out
Home
1987_0608_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1987
>
1987_0608_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2011 3:43:23 PM
Creation date
12/6/2011 3:29:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />WVOW�A <br />ITEM NO., <br />uuuuuuu <br />Department Ap Irova,l Manager Reviewed o. 0 <br />P Agenda Section. <br />Item Description. K,ayo Oil Company's request for rezoning, Special Usi. <br />Permit, and variance at 1583 County Road C. I <br />01, 0 <br />49 # # a <br />lift <br />101 <br />1 11 * # I 4P <br />1i <br />That thirty fleet, of rluicrht-of -way bile ded icated on County Road Cc <br />2.i That therie be a provision of a n,ewi seliwer easement, and that said <br />sewer, construction. be completed according to City specif icat ions. <br />The apipilicant shall furnish the City reproducible as builts upon <br />completion. <br />3. That a concrete sidewalk be constructed on the contiguous public <br />rIghtillillillilillofimmilaway, subJect to staff reiv,31-eW. and/or placement of funds <br />111 <br />,i,n escrowi for sidewalk, requirements. <br />4. That, staff approve finial landscape plan, with larger trees required. <br />5,. That the building be constructed of brick on all four sides,. that <br />I <br />matches the Blyerly's color. <br />That a drivile access be provided, if necessary, for access t," <br />lcontiguous� pirloplertilies to the north,,, i <br />7. That the development be constructed, per plans submitted April 30,, <br />19187., <br />0 0 <br />8,. That the applicant return to the n1ext Planning Commission meeting <br />I ` <br />wiith more Information on exterior of building, and siognage, <br />9. That, the parapet height be increased to cover the mechanical <br />systems on the roofi <br />I <br />us 0"11-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.