Laserfiche WebLink
Har Mar Mall, Case No. 1754 <br />Em <br />staff (principally the Engineering Department), the Har Mar people, and <br />the State over a period of the last several years. The basic change is <br />that of the movement of the access to the Center off of Snelling <br />Avenue somewhat to the south and the elimination of the service road <br />configuration and right-of-ways which, at one time, were dedicated by <br />Mrs. Slavik as a basis for the ultimate development of an interchange <br />at County Road B and Snelling. In other words, the access drives as <br />originally constructed (in 1960) were based on the design for a new <br />interchange to include a grade separation at County Road B and <br />Snelling. As you all know, the decision to construct such an <br />interchange at B and Snelling has since been dropped. Therefore, there is <br />at this time the adjustment to the right-of-way and the service road <br />configurations so as to reflect that design change. <br />7. We feel that the proposed access plan will work very well in the sense <br />that it provides a more positive direction and flow of traffic to the <br />southerly. portion of the site enhancing the use of the larger parking <br />capacity to the south and, of course, to serve the new addition on the <br />southeast corner of the existing structure. These configurations, <br />geometrics, and parking layout was done in conjunction with a traffic <br />consultant hired by the Har Mar people, working in close liaison with <br />the Engineering Department of the City. It would appear that the new <br />layout will work well both for the existing Center and the proposed <br />addition. <br />8. The original property was zoned "Shopping Center" with the southerly <br />extension left as single-family as noted earlier in this report. However, <br />about ten to twelve years ago there was a proposal to build an office <br />building on the northerly portion of the land zoned single-family for <br />which there was a special use permit for parking. to as to <br />accommodate this office building, the land was rezoned from R-1 to <br />B-1B. The Medical Office Building proposed was ultimately not <br />constructed. The B-1B, however, requires a Special Use Permit for site <br />plan approval and that is why such a Special Use Permit is part of the <br />development approval process currently being considered. <br />9. Attached are a series of reductions of five drawings illustrating the <br />proposed development plan, the survey, grading plan, landscape plan, and <br />exterior elevations of the building. With respect to these plans, the <br />Planning. Commission and Council should note that there will be a <br />reduction in the setback for the parking along the south side of County <br />Road B since additional right-of-way is being acquired by the County <br />for future expansion of County Road B. This does not have to be <br />processed as a variance since the Shopping Center District makes <br />provisions for the Council to approve a site plan that may differ from <br />the minimum setbacks required and since such a plan is subject to the <br />Council review and approval. <br />10. Likewise, on the west side of the site near the southwest corner, <br />additional parking is being proposed where the service road at one time <br />extended northerly into the site from the south. Here, parking is <br />proposed contiguous to the lot line. The exact location of this lot <br />line is somewhat in doubt since the planning negotiations for the <br />reacquisition of the land by the Har Mar people from MnDOT are not <br />yet complete. In any case, a sidewalk should be constructed as <br />required along the public right-of-way frontage on Snelling Avenue and <br />County Road B. <br />