Laserfiche WebLink
5, Finance De ,Alt artment--th,is area is also becoming very congested, <br />By moving the Motor Vehincle, activity,, the office can be <br />1 0 01 0 <br />reorganized, prioviding more eff iciency and privacy. The <br />projected cost, of the furniture and equipment Os $15.,000. <br />4h '91 4 <br />8. New, exterior, and interilor s,igning­ -because of moving the <br />Ii 11 <br />Court and, Motor Vehicle,, new, si,gin,ing will be required at an <br />estimiatied cost of $1,,51010.00. <br />L�wecause th,e remodeling lestimateis of $44,,000,.00 were not based on <br />spelcifilc sipecif iciatilons, it is recommended a ten percent contin� <br />giency amount of $4,40�O be provided. <br />o2lhe total estimatied, cost for equipmeint.1 furnIture, and remodeling <br />in <br />is $817,5OO�,.,00. There is $18,67'1.00 from a past appropriation for <br />C 11.1 <br />ity Hiall furniture which, ciould be used,, leaving a net balance <br />of' $68,,800.00 <br />