Laserfiche WebLink
'"I6 FOR COUNCIL ACTION DATE <br />I i 0 <br />I <br />'The Minnesota Department of Transportation has, been doing a maJor proJect at <br />Rice Street and the city's north, city limits,,,, This work consisted of <br />rebuilding # the bridges and <br />` r <br />facilities to, prop rI the storm water, away from these sites. As part of <br />. constructed <br />storm, • from down city Avenue �. - ,rte Joined a.r existing storm ®.. <br />on <br />• doing tihisi worky the state flo,und that the city's watermain was in the way of <br />` new storm concluded '" expensive <br />i move <br />waterwain than it would be to redesign th,e stiorm, pliple and lower it* They,, <br />hI r . e Ii the city, move _ # <br />Since this work was. necessitated by, MnDO�T', then to pay for this <br />agreement lowering, of the waternain.1 They are agreeable to, doling so, but they require a <br />agreement, with them for such, compensation-s That, <br />prepared <br />approving which is our cost, of the work.i <br />Hotillon an agreement with MnDlOT for utility restoration repayment <br />identified, as Agreement No,, 6422A on State Project 6214-64 (T-H* 49). The c ity <br />manager, is, authorized to sigin this agreement in behalf of the City of <br />