My WebLink
|
Help
|
About
|
Sign Out
Home
2011_1212_Packet Amended
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_1212_Packet Amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2011 4:10:07 PM
Creation date
12/9/2011 9:45:29 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br /> City of Roseville 2012 Fee Schedule <br /> 16 D. Maximum fee for single-family dwelling shall not exceed $150.00 if not over <br /> 17 200-ampere capacity. This includes service, feeders, circuits, fixtures and <br /> 18 equipment. The maximum fee provides for not more than two rough-in <br /> 19 inspections and the final inspection per dwelling. Additional inspections are at <br /> 20 the re-inspection rate. <br /> 21 <br /> 22 E. Maximum fee on an apartment building shall not exceed $70.00 per dwelling <br /> 23 unit. A two-unit dwelling (duplex) maximum fee is charged per unit as separate <br /> 24 single-family dwellings. <br /> 25 <br /> 26 F. The maximum number of 0 to 30 ampere circuits to be paid on any one athletic <br /> 27 field lighting standard is 10. <br /> 28 <br /> 29 G. In addition to the above fees: <br /> 30 - A charge of$4.00 will be made for each street lighting standard. <br /> 31 - A charge of$7.00 will be made for each traffic signal standard. Circuits <br /> 32 originating within the standard will not be used when computing fees. <br /> 33 <br /> 34 H. In addition to the above fees, all transformers and generators for light, heat and power <br /> 35 shall be computed separately at $8.00 plus $.40 per KVA up to and including 100 <br /> 36 KVA. 101 KVA and over at $30 per KVA. The maximum fee for any transformer or <br /> 37 generator in this category is$80.00. <br /> 38 <br /> 39 I. In addition to the above fees, all transformers for signs and outline lighting shall <br /> 40 be computed at $8.00 for the first 500 VA or fraction thereof per unit, plus $.70 <br /> 41 for each additional 100 VA or fraction thereof. <br /> 42 <br /> 43 J. In addition to the above fees (unless included in the maximum fee filed by the <br /> 44 initial installer) remote control, signal circuits and circuits of less than 50 volts <br /> 45 shall be computed at$.75 per device. <br /> 46 <br /> 47 K. In addition to the above fees, the inspection fee for each separate inspection of a <br /> 48 swimming pool shall be computed at $35.00. Reinforcing steel for swimming <br /> 49 pools requires arough-in inspection. <br /> 50 <br /> 51 L. For the review of plans and specifications of proposed installations, there shall <br /> 52 be a minimum fee of$150.00 up to and including $30,000 of electrical estimate, <br /> 53 plus 1/10 of 1°Io on any amount in excess of $30,000. To be paid by permit <br /> 54 applicant. <br /> 55 <br /> 56 M. When re-inspection is necessary to determine whether unsafe conditions have <br /> 57 been corrected and such conditions are not subject to an appeal pending before <br /> 58 any Court, a re-inspection fee of $35.00 may be assessed in writing by the <br /> 59 Inspector. <br /> 60 <br /> 61 N. For inspections not covered herein, or for requested special inspections or <br /> 62 services, the fee shall be $35.00 per man hour, including travel time, plus $.25 <br /> 63 per mile traveled, plus the reasonable cost of equipment or material consumed. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.