My WebLink
|
Help
|
About
|
Sign Out
Home
1986_0512_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1986
>
1986_0512_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2011 2:53:38 PM
Creation date
12/9/2011 2:44:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/12/'86 <br />Council Action <br />Pavement Management Program <br />501 October council meeting Council would approve the capital <br />improvement provide miles <br />of street reconstruction, per year at council initiation, and two-thirds <br />of mile of roadway be3ing overlayed ,, • <br />would 'be, for each - program <br />capital improvement <br />it lfl <br />October Council - 4 # + " <br />'the new Pavement Management Program, approach. <br />s <br />detailed 71, Staff and/or consultants would 'begin, their 'investigation and <br />the preparation. of feasibility studies for the area streets <br />selected for the new program, <br />January or flri would • - _ • for - various <br />improvements based on �� a 4 � system - and lip <br />initiation. <br />existing Iti is very, important, that the Process begin as soon as possible for modifying <br />the policies implementing _ _I,i As • - seen from <br />the ablove, this is fairly time consumin�g, Therefore, if there are any <br />modific, at ion, s to this approach, it would 'be very desirable that they be known <br />as soon as possible or the program., program.,will not to be undertaken during <br />the r <br />MOO <br />Motion ag roving the proposed, schedule and, approach for processing the Pavement <br />1 " it - P - .. Ifl[ <br />
The URL can be used to link to this page
Your browser does not support the video tag.