Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />• <br />e artm n.t Approval : Manager Reviewed: � Agenda Section: <br />Reports and Recd mm endatlon <br />Item Description: Feasibility Study, 'or the Northwest Frontage <br />Road Snelling Avenue and County Road <br />Prioij�ect P-83-06., <br />a 91 01 it A <br />With, this jLn mind is now time f or thie City to take the next ste3i, <br />it 1i <br />in the proceiiss of implementing this improvement, The Feasibility <br />Study has been Prepared,, and a Public Hearing should be scheduled as <br />,soon as possl The r recommended <br />could be heard at the siame time as other improvements whIch are <br />already scheduled for that date. <br />#n, the southeast coriner where the Har Mar property exists, a separat,-_, <br />Feasibi il lity Study has, been prepared f or looping that Frontage Road <br />Hari Mar and, MnDOT have,, worked extensively together f or the relocat-lon <br />at the entrance to Hari Mar, and the total revamp ing of the Frontage <br />Road, parking f or, the, sho , <br />it =i <br />Adoption of a resiiolution accept3-ng, thie Feasibility Study for Projecl <br />Pi-813-061,, and ordering a, Public Improvement Hearing for the date of <br />july 28,1 1,91816,o <br />